Draft West Mundijong Industrial Area Structure Plan 2020
Share Draft West Mundijong Industrial Area Structure Plan 2020 on FacebookShare Draft West Mundijong Industrial Area Structure Plan 2020 on TwitterShare Draft West Mundijong Industrial Area Structure Plan 2020 on LinkedinEmail Draft West Mundijong Industrial Area Structure Plan 2020 link
This project is complete
Outcome
At its March meeting, Council recommended to the Western Australian Planning Commission that the proposed West Mundijong Industrial Area Structure Plan be approved subject to the Schedule of Modifications. To view the Council decision, visit the Shire's Agenda and Minutes page and view the March Council Meeting Minutes.
Background
The Shire has prepared the above mentioned structure plan in regard to land located in West Mundijong Industrial Area Precinct.
This structure plan provides for a phased approach to subdivision. The first phase is termed a dry lot industrial subdivision, which is subject to a minimum lot size of 1.5 -2ha;
This first phase is not reliant on reticulated water or sewer infrastructure being provided;
The 1.5 - 2ha minimum lot size requirement is to provide flexibility for onsite potable water catchment (via water tanks) and onsite effluent disposal;
Intensity of development is also compatible with current road infrastructure limits, and the planned upgrades reflective of the Development Contribution Scheme for the area.
Plans and documents setting out and explaining the draft structure plan have been deposited at the Shire’s administration building at 6 Paterson Street, Mundijong and is available for inspection during office hours between 8:30am to 5pm. Alternatively, you can access the plans on the right hand side of this page under "documents".
Making a submission
Submissions on the structure plan may be lodged by one of the following ways:
Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA20/1197
A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA20/1197, property affected and details of the submission and lodged with the undersigned. A submission form is available on the right hand side of this page under "documents".
Submissions close 5pm, 24 January 2021.
Outcome
At its March meeting, Council recommended to the Western Australian Planning Commission that the proposed West Mundijong Industrial Area Structure Plan be approved subject to the Schedule of Modifications. To view the Council decision, visit the Shire's Agenda and Minutes page and view the March Council Meeting Minutes.
Background
The Shire has prepared the above mentioned structure plan in regard to land located in West Mundijong Industrial Area Precinct.
This structure plan provides for a phased approach to subdivision. The first phase is termed a dry lot industrial subdivision, which is subject to a minimum lot size of 1.5 -2ha;
This first phase is not reliant on reticulated water or sewer infrastructure being provided;
The 1.5 - 2ha minimum lot size requirement is to provide flexibility for onsite potable water catchment (via water tanks) and onsite effluent disposal;
Intensity of development is also compatible with current road infrastructure limits, and the planned upgrades reflective of the Development Contribution Scheme for the area.
Plans and documents setting out and explaining the draft structure plan have been deposited at the Shire’s administration building at 6 Paterson Street, Mundijong and is available for inspection during office hours between 8:30am to 5pm. Alternatively, you can access the plans on the right hand side of this page under "documents".
Making a submission
Submissions on the structure plan may be lodged by one of the following ways:
Email your feedback to info@sjshire.wa.gov.au stating the following reference number: PA20/1197
A written submission, submitted by mail or in person to 6 Paterson Street, Mundijong, including the reference number: PA20/1197, property affected and details of the submission and lodged with the undersigned. A submission form is available on the right hand side of this page under "documents".
Draft West Mundijong Industrial Area Structure Plan 2020 has finished this stage
Consultation for this project commenced on 10 December 2020 and closes at 5pm, 24 January 2021.
Under Review
Draft West Mundijong Industrial Area Structure Plan 2020 has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
Draft West Mundijong Industrial Area Structure Plan 2020 is currently at this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.