Share Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup on FacebookShare Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup on TwitterShare Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup on LinkedinEmail Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup link
Background
The Shire has received a development application for which comments are sought for a Concrete Manufacturing Facility currently operating in the southern portion of Lot 60 Robertson Road, Cardup.
The facility currently manufactures and supplies engineering products for infrastructure, mining, marine and rail construction projects for which this application seeks retrospective approval.
In addition, the application seeks to further develop the site to allow for increased manufacturing. The components of the application that already exist onsite are as follows:
Concrete Casting Workshop (3,750m2)
Two stressing beds and associated gantry cranes
Stormwater basin to the west of the site
Office and lunchroom
The proposed development comprises of the following components:
Car park (120 bays)
A V-Drain along the southern boundary leading to the basin
A below ground stressing bed and gantry crane located centrally to the site
An above ground stressing bed and gantry along the southern boundary (east of the shed)
Precast concrete is poured into a reusable mould, cured and then lifted into place. (Full details of the process is contained within page 11 of the applicant’s report). The throughput varies on market demand however the site has the capacity to produce on average approximately 2000 tonnes of concrete products per day.
Typically, the facility would commence manufacture at 6am until 6pm. There are currently between 60 and 70 staff associated with the overall operations expected to increase over the coming years.
Access to the site is via the existing driveway onto Robertson Road.
Where can I view the information?
The documents setting out and explaining the proposal are available to view under the "Documents" section of this page.
How can I comment?
The public comment period has now closed.
How can I find out more information?
The assessing teams contact details can be found on the right of this page. You can also contact the Shire's Administration Centre on 9526 1111.
Background
The Shire has received a development application for which comments are sought for a Concrete Manufacturing Facility currently operating in the southern portion of Lot 60 Robertson Road, Cardup.
The facility currently manufactures and supplies engineering products for infrastructure, mining, marine and rail construction projects for which this application seeks retrospective approval.
In addition, the application seeks to further develop the site to allow for increased manufacturing. The components of the application that already exist onsite are as follows:
Concrete Casting Workshop (3,750m2)
Two stressing beds and associated gantry cranes
Stormwater basin to the west of the site
Office and lunchroom
The proposed development comprises of the following components:
Car park (120 bays)
A V-Drain along the southern boundary leading to the basin
A below ground stressing bed and gantry crane located centrally to the site
An above ground stressing bed and gantry along the southern boundary (east of the shed)
Precast concrete is poured into a reusable mould, cured and then lifted into place. (Full details of the process is contained within page 11 of the applicant’s report). The throughput varies on market demand however the site has the capacity to produce on average approximately 2000 tonnes of concrete products per day.
Typically, the facility would commence manufacture at 6am until 6pm. There are currently between 60 and 70 staff associated with the overall operations expected to increase over the coming years.
Access to the site is via the existing driveway onto Robertson Road.
Where can I view the information?
The documents setting out and explaining the proposal are available to view under the "Documents" section of this page.
How can I comment?
The public comment period has now closed.
How can I find out more information?
The assessing teams contact details can be found on the right of this page. You can also contact the Shire's Administration Centre on 9526 1111.
Send us your comments by 5pm Tuesday, 25 April 2023.
Share Development Application Submission Form on FacebookShare Development Application Submission Form on TwitterShare Development Application Submission Form on LinkedinEmail Development Application Submission Form link
Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup has finished this stage
This consultation is open for contributions.
Under Review
Concrete Manufacturing Facility - Lot 60 Robertson Road, Cardup is currently at this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.