Serpentine Townsite Local Structure Plan

Share Serpentine Townsite Local Structure Plan on Facebook Share Serpentine Townsite Local Structure Plan on Twitter Share Serpentine Townsite Local Structure Plan on Linkedin Email Serpentine Townsite Local Structure Plan link
image of the town centre of Serpentine

Consultation has concluded and a decision has been made.

Outcome

At its meeting in May 2021, Council recommended that the WA Planning Commission approves the Serpentine Townsite Local Structure Plan subject to modifications.

To view the Council decision, visit the Shire's Agenda and Minutes page and view the May Council Meeting Minutes.

Background

The Draft Structure Plan was originally publicly advertised between 13 March 2014 and 4 April 2014 for comment. Council considered the Draft Structure Plan at the Ordinary Council Meeting held on 7 December 2015 and made a recommendation to the WAPC to support the Draft Structure Plan subject to modifications. The Draft Structure Plan was considered by the Statutory Planning Committee (SPC) of the WAPC on 30 January 2018. The WAPC required a number of modifications to be made to the Draft Structure Plan and for the modified Draft Structure Plan to be re-advertised for a period of 28 days. These modifications were extensive, and required a number of additional studies to inform revisions to reflect the WAPC interim decisions. The key modifications required by the WAPC included:

• The Residential R10 coding being removed and replaced with Residential R5.

• The Rudall Street Public Open Space being revised.

• The Local Water Management Strategy and Public Open Space Schedule being updated.

• A Bushfire Management Plan being prepared.

• A Wetland Assessment and Site-Specific Wetland Buffer Study being prepared.

The Shire has undertaken all the modifications required by the WAPC and has now been re-advertised with he modified Draft Structure Plan. The modified Draft Structure Plan identifies land for the purposes of Residential R5, Neighbourhood Centre, public open space, public and community purpose and education. The Draft Structure Plan area has an approximate potential lot yield of 368 lots.

How can I comment

The public comment period has now closed.

Consultation has concluded and a decision has been made.

Outcome

At its meeting in May 2021, Council recommended that the WA Planning Commission approves the Serpentine Townsite Local Structure Plan subject to modifications.

To view the Council decision, visit the Shire's Agenda and Minutes page and view the May Council Meeting Minutes.

Background

The Draft Structure Plan was originally publicly advertised between 13 March 2014 and 4 April 2014 for comment. Council considered the Draft Structure Plan at the Ordinary Council Meeting held on 7 December 2015 and made a recommendation to the WAPC to support the Draft Structure Plan subject to modifications. The Draft Structure Plan was considered by the Statutory Planning Committee (SPC) of the WAPC on 30 January 2018. The WAPC required a number of modifications to be made to the Draft Structure Plan and for the modified Draft Structure Plan to be re-advertised for a period of 28 days. These modifications were extensive, and required a number of additional studies to inform revisions to reflect the WAPC interim decisions. The key modifications required by the WAPC included:

• The Residential R10 coding being removed and replaced with Residential R5.

• The Rudall Street Public Open Space being revised.

• The Local Water Management Strategy and Public Open Space Schedule being updated.

• A Bushfire Management Plan being prepared.

• A Wetland Assessment and Site-Specific Wetland Buffer Study being prepared.

The Shire has undertaken all the modifications required by the WAPC and has now been re-advertised with he modified Draft Structure Plan. The modified Draft Structure Plan identifies land for the purposes of Residential R5, Neighbourhood Centre, public open space, public and community purpose and education. The Draft Structure Plan area has an approximate potential lot yield of 368 lots.

How can I comment

The public comment period has now closed.

  • CLOSED: This survey has concluded.

    Send us your comments by 5pm Wednesday, 24 February 2021.

    Please note that only submissions with verifiable names and addresses can be accepted.

    The reference number for this project is SJ993-02